Surface preparations prior to painting included stain block spot primer coats, crack repairs, removal of disused wall bolts, grinding, sanding and cleaning of the existing black metal access stairwell.
A low sheen top coat was applied to the concrete ceiling, concrete walls and associated pipes/conduit with a semi-gloss paint applied to the plant room access doors & frames. The rooftop plant room concrete floors was covered with a fine non-slip aggregate.
In addition to the painting we supplied and installed a new metal cover plate to seal existing vertical cable guard, new concrete bunded walls to the tape area in “U-Shape” format and new Galvanised metal surround to the wall mounted air-ventilation grill.
I have found Craftwork to be professional and extremely flexible in their approach, being able to flex their on site staffing according to hotel occupancy. Their team is well presented and create little noticable disruption to our normal business routines.