Rooftop Plantroom Internal Upgrade

Rooftop Plantroom Internal Upgrade

Surface preparations prior to painting included stain block spot primer coats, crack repairs, removal of disused wall bolts, grinding, sanding and cleaning of the existing black metal access stairwell.

A low sheen top coat was applied to the concrete ceiling, concrete walls and associated pipes/conduit with a semi-gloss paint applied to the plant room access doors & frames. The rooftop plant room concrete floors was covered with a fine non-slip aggregate.

In addition to the painting we supplied and installed a new metal cover plate to seal existing vertical cable guard, new concrete bunded walls to the tape area in “U-Shape” format and new Galvanised metal surround to the wall mounted air-ventilation grill.